Sunday, September 20, 2015

Tree House: 9/18 - 9/19

9/18 - 9/19

Seeing all of this costly siding scrap pile up has been maddening. I decided to make the most of it by patch-working the neglected bits into a sub-floor. Ultimately, there will be some type of laminate product laid down. For now, this will do as the step up from just having open slat decking under foot. Also, it gave me an application for left over roofing tar paper:


Then it was on to the loft. One day, there will be a ladder:





It's wide enough for 2 adult size camping pads. Of course, there will be a protective railing. I'll install it once I've applied all of the finished wall board.